Aiming to be the "fastest time to permit."
- Site Development
- Residential Development
- Public Utilities
- Transportation and Traffic
- Hydraulics and Hydrology
- Surveying & Platting
OFFICES IN
HOUSTON | KATY | AUSTIN | DALLAS
Six Generations of Engineering Excellence Since 1846
E.S. and John Atkinson with crew surveying the Copper Canyon Railroad in 1902
Six generations ago in the 1840s, my great, great, great, grandfather came to Texas with the United States army under General (later President) Zachry Taylor and soon began surveying land grants for the soldiers and heroes of Texas’ independence and protection. His journals include stories of packs of a Grey Wolf, aptly enough named the Texas Wolf. Classified as extinct in the 1960s, the Texas Grey Wolf is being spotted once again in Texas, as a demonstration of the indominable Spirit of Texas. The Grey Wolf’s strength comes from Speed, Collaboration and Problem Solving. Grey Wolf Engineers is focused on delivering the fastest “time to permit”, through the same three attributes: Speed, Collaboration, and Problem Solving. Would it have made a difference if your last project was permitted a month sooner?